Our Projects
We actively contribute to a responsible energy transition towards a low carbon systems by providing solutions CCUS including geological H2, natural gas and CO2 storage solutions.
![](https://bingaenergy.nl/wp-content/uploads/2019/02/lab-1825276.jpg)
Consulting Services
Development of new chemical EOR methods.
April 2015 - December 2018
Binga Energy conducted extensive laboratory studies, modeling and numerical simulation studies on a new chemical EOR method.
![](https://bingaenergy.nl/wp-content/uploads/2019/02/construction-1895879.jpg)
Technical & Economic Analysis
Establishment of a new geo-energy institute.
April 2015 - April 2018
Binga Energy conducted complete design, planning and execution of the construction of a laboratory and offices for this institute. Binga Energy also commissioned state of the art equipment and recruited the first team scientists including the management team of the Institute.
![](https://bingaenergy.nl/wp-content/uploads/2019/02/sunset-3174093.jpg)
Consulting Services
CO2 injection into an offshore medium heavy oil field in Suriname.
February 2013 - June 2014
Binga Energy provided technical consultancy services including reservoir simulation, field life cycle scenario analysis, PVT and core-flood laboratory studies
![](https://bingaenergy.nl/wp-content/uploads/2019/01/netherlands-1707392.jpg)
Feasibility Study
CO2 injection into tight gas reservoir in the Netherlands.
November 2011 - July 2012
Binga Energy provided the reservoir simulation and core-flood simulation studies.
![](https://bingaenergy.nl/wp-content/uploads/2019/01/oil-industry-3289176.jpg)
Feasibility Study
Foam-assisted gas injection into offshore North Sea oil reservoir.
September 2008 - October 2010
Binga Energy conducted reservoir simulation and laboratory study.